Building Pavlov's House

A couple of weeks ago, I was lucky enough to get my hands on some of the lovely 'Pavlov's House' kits from Things From The Basement in partnership with 4Ground - here's the first:

 
The Editor hinted that I might find it more of a challenge to assemble than it appeared, but I'm confident with such kits now, so I warily remarked that I ought probably to find it quite achievable; certainly this particular one was lightweight and looked pretty straightforward...
The instructions are friendly enough - they include clear colour photos, as 4Ground kits tend to, and an introduction with handy tips. The parts themselves were well machined and clean: the white-painted cardstock cladding is bright and my wife was particularly struck by the striking green colour ("It looks like the kind of green that should have been outlawed in the 70s") until I noted that it was inspired by a real building made famous in the battle of Stalingrad.
This paint was the first issue though: in fitting the parts together, I discovered an issue which I've occasionally found in other 4Ground kits: the layers of paint make the parts too thick.
This is fine most of the time, as tabs can simply be shaved down to ensure they sit snugly into their given notches - this still works even when the part to be inserted is painted on both sides.

(Note the clean-shaven tabs)

The real issue comes not in sticking tabs into slots, but when you have to start layering painted parts together or when you have to insert an assembled piece into place with two painted planes against each other - in this case, the stairs, which need to be flush against the back wall. Unless you shave the paint off, it just will not go together properly, and you risk the UDF warping or breaking - a pity.

The silvery line on the fifth stair up marks how much paint I had to shave (this lower portion lies flush with the wall).

The pic below is of another paint-layer-inflicted awkwardness: the (surely almost redendant) inserts which go behind the kickboards on the stairs are rendered too wide to squeeze into place because of the paint, but all the dry-fitting in the world can't alert you to this problem until the stairs are built, so without being able to shave off the paint layers in the recesses, the only choice is to take some length from the inserts. I took 1.5-2mm off each.
Then I got to the bricks, and I believe this bit explains the Editor's wry amusement...
I wish I'd photographed the building before adding the bricks to better illustrate the difference they make - I just love how very very unique it can look!
In short, they are as much a pain to arrange and glue in place as they are tremendously good fun to arrange and play with! It took me an evening to assemble this small part of Pavlov's House using PVA and superglue, and fully half of that was just bricklaying...but once I got the hang of it, I had a blast!

(the top-centre pile of rubble in this pic was vital to add, as without it that middle-section of wall was a bit too flimsy, despite the ruggedly thick components.)

Now, where's that orangey-brown 'brick-dust' basing sand I had stashed away..?

2 thoughts on “Building Pavlov's House”

  • Jonathan Yuengling
    Jonathan Yuengling July 24, 2020 at 9:53 pm

    This look really good and I hope we can see the finished product.

    Reply
    • Chris King

      Thanks, Jonathan,

      Well, I guess that's up to Guy, our Editor, but I'm certainly looking forward to building the next (far bigger) part of the building!

      Reply
Leave a Reply
Post your comment